TMLD20 Insulated Platform Steps
- The handrail is made of FRP insulation material.
- The foot step is made of aluminum alloy.
- Insulation voltage 35kV.
- 30cm spacing per step.
- Maximum load 150kg.
- EN131 certificate.
Order Code TMLD20 |
Height (cm) |
Number of Steps |
Weight (kg) |
-12004N | 120 | 4 x 2 | 7.6 |
-12006N | 180 | 6 x 2 | 11.2 |
-12008N | 240 | 8 x 2 | 15.0 |
-12010N | 300 | 10 x 2 | 19.0 |
TMLD20 Insulated Platform Steps